Define your top navigation in Apperance > Menus
Welcome message!

Snap-Back® Wing Pulleys Replacement Instructions

Snap-Back-Replacement-Instructions-EnglishREPLACEMENT OF SNAP BACK RUBBER AND URETHANE LAGGING

STEP ONE

REMOVE WORN RUBBER STRIP. Insert small pry bar or heavy screwdriver between the end of rubber strip and inner 14 ga. steel channel and pry outward.

STEP TWO

REMOVE 14 GA. STEEL CHANNEL. Loosen channel by tapping edges with a hammer or by driving it out with a block or drift. This part IS NOT re-used.

STEP THREE

CLEAN INSIDE OF 7 GA. WING CHANNEL. Remove rust, dirt and scale from inside surfaces of wing channel and lubricate lightly. Check ends of channel for burrs or sharp edges. The inside corners of the narrow flange should be rounded slightly.

STEP FOUR

INSTALL NEW RUBBER INSERT cement rubber and channel assembly into end of wing. Insert end of repl-channel and drive into place with a block of hardwood and a heavy hammer.